About This Course:
This 2.5-hour live lecture presentation examines factors that impact the estimate of utilities, the impact of earth spoils on the cost estimate, and the optimization of truck assignments. Sample estimates, including the cost of handling spoils, as well as the logic for their developments, will be explained.
Course Code: AIA 500ESWR
Accreditation: 2.5 AIA LU-HSW / PDH / PE(NY)
Duration: 2.5 Hours
About the Speaker:
Henry Yu
PE, P.Eng. (Canada), PMP, WELL AP, LEED GA,CTS
Principal Estimator at the Port Authority of New York & New Jersey, possessing more than 20 years of experience in establishing and reviewing estimates for heavy civil construction projects of various types (aviation, passenger and freight rails, roadways and utilities, bridges and tunnels, etc.) and at all design stages (from order-of-magnitude through bid estimates), and proficient in both design-bid-build and design-build / fast-track projects. Currently assigned to be the lead estimator to the $13 billion JFK Redevelopment Program and responsible for conceptual estimate development and audit reviews. Previously worked for STV, Incorporated, Con Edison, MTA New York City Transit and MTA Bridges & Tunnels. Professional licences and credentials include:Professional Engineer (PE) in New York State Professional Engineer (P. Eng.) in the Provinces of Alberta and British Columbia, Canada PMI Project Management Professional (PMP) WELL AP USGBC / GBCI LEED Green Associate AVIXA Certified Technology Specialist